Manufacturing Hall "ARIANE 5"
CUSTOMER
WURST Stahlbau
Building owner: MT Aerospace Holding GmbH
Architects: Haslob Kruse + Partner Architekten BDA, Bremen
PROJECT
CHALLENGES
New construction of the ‘ARIANE 5’ production hall in Bremen, Germany
The special feature of the new construction of the ARIANE 5 production hall was the external net construction made of RRO hollow sections in front of the building. There are no visible screw connections on the outside of the external net construction (the hollow section construction was interlocked or hooked together and screwed from behind through large holes in the tube walls = see photos and drawings), the external net construction is only held at the eaves (height 21m) and at the base (no fixings through the façade), due to the geometry of the net (no radius or angle was the same) each connection in the construction had to be individually adapted.
ADVANTAGES
The requirements for the software were the creation of detailed perspectives for better visualisation for the architect, the creation of natural sizes for processing the hollow profiles in production, the creation of detailed drawings for production and assembly as well as general drawing derivation.
Particularly helpful bocad features:
DWG imports and DWG exports
Fabrication Management (bocad ps)