New railway bridge Castielerviaduct

CUSTOMER

Schneider Stahlbau AG, Jona, Schweiz
Building owner: Rhätische Bahn

PROJECT
CHALLENGES

New construction of Castielerviaduct:
The bridge is bolted so that the tolerances for welded longitudinal beams are ±1mm.
Difficult conditions on site (no road access, approx. 60m from the ground)
Bridge is being built next to the existing bridge and will be inserted later, requiring an assembly concept
2 weeks track possession (demolish old bridge, slide in new bridge, concreting work, lay tracks)
Sheet thicknesses from 3mm - 100mm.

ADVANTAGES

Helpful bocad features:
georeferenced
import of coordinates and STEP files
read in coordinates