top of page
Sports Campus, Technical University
CUSTOMER
Rubner Holzbau
Building owner: Freistaat Bayern, Staatl. Bauamt München II, München
Architect: Dietrich | Untertrifaller Architekten ZT GmbH, Dornbirn
PROJECT
CHALLENGES
Sports Campus of Technical University (TUM, Olympic Park Munich, Germany:
New building for the Department of Sports and Health Sciences / ZHS.
In addition to the size of the project, the roofing of the 100m running track was also a challenge.
The roof consists of 40 elements measuring 28 x 3.75 metres with a free cantilever of 18 metres.
ADVANTAGES
Challenges for the software: Due to the size of the project, several designers had to work simultaneously on the different construction phases.
It was difficult and sometimes impossible to bring them together in one model.
Helpful features of bocad: IFC interface
bottom of page