top of page
Torres Colón
CUSTOMER
TAUXME Structural Steel Works
PROJECT
CHALLENGES
High-rise refurbishment Torres Colón - Madrid, Spain:
The Torres Colón required careful coordination due to its unconventional construction method, where the floors were built from top to bottom. This presented logistical and structural challenges that demanded high levels of precision in both planning and execution.
ADVANTAGES
The use of bocad software allowed for the precise modeling of the unique "suspended" construction method of Torres Colón. This approach enabled detailed simulation and planning of the load-bearing central cores, from which the floors were suspended, ensuring stability and structural integrity throughout the building's unique design.
bottom of page