Tour Silex 2
CUSTOMER
SMB (Metallic Constructor)
PROJECT
CHALLENGES
Tour Silex 2 in Lyon, France:
Rehabilitation of the existing tower and construction of the top four floors (R+21 to R+24) required precision and high technical expertise, working with a 130m tall structure and integrating new exoskeleton elements.
ADVANTAGES
The complete metallic structure of the adjacent tower was constructed with 25 floors, including technical zones and 8 cantilevered floors. SMB carried out the exoskeleton cladding, collaborating on every level.